Projects – Alhassan https://alhassancon.com Al-Hassan For Construction Co. Mon, 10 Nov 2025 11:45:41 +0000 en-US hourly 1 https://wordpress.org/?v=6.9.4 https://alhassancon.com/wp-content/uploads/2025/09/cropped-logo-png-4-32x32.png Projects – Alhassan https://alhassancon.com 32 32 Villa Dr ahmed Gazr https://alhassancon.com/villa-dr-ahmed-gazr/ https://alhassancon.com/villa-dr-ahmed-gazr/#comments Mon, 27 Oct 2025 14:29:26 +0000 https://alhassancon.com/?p=2117 Owner

DR Ahmed gazr

Scope of Work

*supply & Apply All arrangement works *Supply & cast P.C & R.C For The swimming Pool *Supply and Apply all arrangement works for the swimming pool including waterproofing , ceramic , stainless steel handrails , pump ….etc *Supply & Apply the pergola iculuding steel structure , R.C flooring , wood works …etc *Supply and Apply all land scape works including fences, gate…..etc

Location

swan lake compound

Year

2021

]]>
https://alhassancon.com/villa-dr-ahmed-gazr/feed/ 33
National company for maize products https://alhassancon.com/national-company-for-maize-products/ https://alhassancon.com/national-company-for-maize-products/#comments Mon, 27 Oct 2025 14:10:24 +0000 https://alhassancon.com/?p=2112 Owner:
National Company for Maize Products

Scope of Work:

The steel structure work of the Glucose building

Location:

10th of Ramadan City

Year:

2014
]]>
https://alhassancon.com/national-company-for-maize-products/feed/ 2
meditex factory https://alhassancon.com/meditex-factory/ https://alhassancon.com/meditex-factory/#comments Sun, 26 Oct 2025 14:18:05 +0000 https://alhassancon.com/?p=2107 Owner
meditex

Scope of Work

All civil works

Location

industrial zone obour city

Year

2025
]]>
https://alhassancon.com/meditex-factory/feed/ 1
EMARAT MISR https://alhassancon.com/emarat-misr/ https://alhassancon.com/emarat-misr/#comments Sun, 26 Oct 2025 11:43:59 +0000 https://alhassancon.com/?p=2084 Owner

EMARAT MISR is the proud owner of this project, overseeing its development and execution with a commitment to excellence.

Consultant

NPPI serves as the consultant, providing expert guidance and technical support to ensure the project’s success and compliance with industry standards.

Scope of Work

The scope of work encompasses the design, fabrication, and installation of the steel structure for the gas station, delivering a robust and reliable infrastructure.

Location

The project spans multiple locations, including El meerag Station, Sadat Station, CFC Station, and Ain sokhna Station, catering to diverse regional needs.

Duration

The total duration of the project is set at 4 years, reflecting a comprehensive timeline to achieve high-quality results across all phases.

]]>
https://alhassancon.com/emarat-misr/feed/ 4
Al-Tayseer Healthcare Group https://alhassancon.com/al-tayseer-healthcare-group/ https://alhassancon.com/al-tayseer-healthcare-group/#comments Sun, 26 Oct 2025 11:39:24 +0000 https://alhassancon.com/?p=2082 Owner
  • Al-Tayseer Healthcare Group

Scope of Work

  • Stage 1
    • Design, Fabrication and Erection of Sidewalks in the 4th, 5th, and 6th Floors
  • Stage 2
    • Design, Fabrication and Erection of All Steel Structure For The Following:
      • Boilers Shed
      • Chillers Shed
      • Restaurant
    • All Cladding Works
  • Stage 3
    • Design, Fabrication and Erection of All Steel Structure For Entrance Area
    • All Decking Works

Location

  • Zagazig

Year

  • 2021-2022
]]>
https://alhassancon.com/al-tayseer-healthcare-group/feed/ 6
Villa Eng Tarek Shokry https://alhassancon.com/villa-eng-tarek-shokry/ https://alhassancon.com/villa-eng-tarek-shokry/#comments Mon, 20 Oct 2025 12:14:59 +0000 https://alhassancon.com/?p=1926 Owner: Eng Tarek Shokry
Consultant: Arabia Holding
Scope of Work
  • Steel Design and Shop Drawing: Preparation of detailed designs and shop drawings for the swimming pool and mezzanine structures.
  • Fabrication & Erection: Complete fabrication and installation of steel structures on site.
  • Decking Works: Supply and application of all decking materials and finishes.
]]>
https://alhassancon.com/villa-eng-tarek-shokry/feed/ 11
villa eng essam kfafy https://alhassancon.com/villa-eng-essam-kfafy/ https://alhassancon.com/villa-eng-essam-kfafy/#comments Mon, 20 Oct 2025 12:11:49 +0000 https://alhassancon.com/?p=1923 Owner: Eng. Essam Kafafy
Scope of Work
The project included supply, fabrication, and erection of steel structures for the landscape, along with renovation of the building facade.
It also covered reinforced concrete works for floors and supply and installation of the fire system to ensure full safety compliance. ]]>
https://alhassancon.com/villa-eng-essam-kfafy/feed/ 10
Villa Dr Gazr https://alhassancon.com/villa-dr-gazr/ https://alhassancon.com/villa-dr-gazr/#comments Mon, 20 Oct 2025 12:09:21 +0000 https://alhassancon.com/?p=1921 Owner: DR Gazr
Scope of Work
The project included full arrangement works, covering all necessary installations and finishes.
Swimming Pool Works
Supply and casting of P.C. and R.C. structures for the swimming pool. Applied all arrangement works including waterproofing, ceramic finishes, stainless steel handrails, and pump installations.
Pergola Works
Supply and application of the pergola, including steel structure, R.C. flooring, and wood works.
Landscape Works
Complete landscape implementation, including fences, gates, and other exterior finishes.
]]>
https://alhassancon.com/villa-dr-gazr/feed/ 11
tayseer med https://alhassancon.com/tayseer-med/ https://alhassancon.com/tayseer-med/#comments Mon, 20 Oct 2025 12:07:47 +0000 https://alhassancon.com/?p=1918 Owner: Tayseer Med
Scope of Work
Fabrication and erection of the metal base for the chiller, ensuring full structural stability and precise alignment for operational efficiency.
Location
Obour Industrial Area, Egypt
]]>
https://alhassancon.com/tayseer-med/feed/ 2
Sika Egypt https://alhassancon.com/sika-egypt/ https://alhassancon.com/sika-egypt/#comments Mon, 20 Oct 2025 12:04:31 +0000 https://alhassancon.com/?p=1915 Owner: Sika Egypt
Scope of Work – Stage 1
Supply and install the new fire fighting line and connect it to the existing firefighting network. The works included inspection, testing, and commissioning of the complete network, including pipes, valves, and pumps.
Scope of Work – Stage 2
Demolish the old reinforced concrete (R.C) floor completely and remove all debris to the municipality. Supply and cast a new R.C floor for the production plant, ensuring full structural compliance.
]]>
https://alhassancon.com/sika-egypt/feed/ 4