{"id":1786,"date":"2025-10-20T11:02:21","date_gmt":"2025-10-20T11:02:21","guid":{"rendered":"https:\/\/alhassancon.com\/?p=1786"},"modified":"2025-10-26T12:19:20","modified_gmt":"2025-10-26T12:19:20","slug":"gme-paintshop-extension-project","status":"publish","type":"post","link":"https:\/\/alhassancon.com\/gme-paintshop-extension-project\/","title":{"rendered":"GME &#8211; paintshop extension project"},"content":{"rendered":"<h4 dir=\"auto\">Owner<\/h4>\n<p dir=\"auto\">GME<\/p>\n<h4 dir=\"auto\">Consultant<\/h4>\n<p dir=\"auto\">MEG<\/p>\n<h4 dir=\"auto\">Project Overview<\/h4>\n<p dir=\"auto\">The Paint Shop Extension Project aimed to increase production capacity from 5,000 cars\/year to 50,000 cars\/year through four key phases that included structural, mechanical, and automation upgrades.<\/p>\n<h4 dir=\"auto\">Phase 1 \u2013 Structural and Mechanical Works<\/h4>\n<p dir=\"auto\">Included the design, fabrication, and erection of a new steel structure, supply and installation of chequered plates, and roller beds with full connection to the existing paint shop system.<\/p>\n<h4 dir=\"auto\">Phase 2 \u2013 Painting System Upgrade<\/h4>\n<p dir=\"auto\">Involved dismantling the old painting cabins, installing new modern cabins, and implementing new control panels alongside complete electromechanical works to enhance efficiency and reliability.<\/p>\n<h4 dir=\"auto\">Phase 3 \u2013 Mezzanine Construction<\/h4>\n<p dir=\"auto\">Focused on the design, fabrication, and erection of a second mezzanine steel structure (over-deck type) to expand operational and maintenance access areas.<\/p>\n<h4 dir=\"auto\">Phase 4 \u2013 Robotics Integration<\/h4>\n<p dir=\"auto\">Execution of 10 new automated painting robots with all necessary electromechanical systems to achieve high precision and productivity.<\/p>\n<h4 dir=\"auto\">Contributing Companies<\/h4>\n<p dir=\"auto\">Sailem Korea Eins Korea A-H-C Egypt<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Owner GME Consultant MEG Project Overview The Paint Shop Extension Project aimed to increase production capacity from 5,000 cars\/year to 50,000 cars\/year through four key phases that included structural, mechanical, and automation upgrades. Phase 1 \u2013 Structural and Mechanical Works Included the design, fabrication, and erection of a new steel structure, supply and installation of [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_eb_attr":"","footnotes":""},"categories":[9],"tags":[],"class_list":["post-1786","post","type-post","status-publish","format-standard","hentry","category-projects"],"_links":{"self":[{"href":"https:\/\/alhassancon.com\/wp-json\/wp\/v2\/posts\/1786","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alhassancon.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/alhassancon.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/alhassancon.com\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/alhassancon.com\/wp-json\/wp\/v2\/comments?post=1786"}],"version-history":[{"count":4,"href":"https:\/\/alhassancon.com\/wp-json\/wp\/v2\/posts\/1786\/revisions"}],"predecessor-version":[{"id":2102,"href":"https:\/\/alhassancon.com\/wp-json\/wp\/v2\/posts\/1786\/revisions\/2102"}],"wp:attachment":[{"href":"https:\/\/alhassancon.com\/wp-json\/wp\/v2\/media?parent=1786"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/alhassancon.com\/wp-json\/wp\/v2\/categories?post=1786"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alhassancon.com\/wp-json\/wp\/v2\/tags?post=1786"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}